IWWA PROJECT REPORTS II

Documents

Order by : Name | Date | Hits [ Ascendant ]

WP1 Report WP1 Report

hot!
Date added: 11/25/2014
Date modified: 11/25/2014
Filesize: 976.15 kB
Downloads: 994

SWM Practices in West Africa_EMPA SWM Practices in West Africa_EMPA

hot!
Date added: 11/25/2014
Date modified: 11/25/2014
Filesize: 858.63 kB
Downloads: 1260

IWWA_WP3_Guide for selecting SWM System IWWA_WP3_Guide for selecting SWM System

hot!
Date added: 11/25/2014
Date modified: 11/25/2014
Filesize: 3.37 MB
Downloads: 1079

IWWA_Task 3.2 Restructured IWWA_Task 3.2 Restructured

hot!
Date added: 11/25/2014
Date modified: 11/25/2014
Filesize: 1.5 MB
Downloads: 1069

IWWA_Deliverable 2 IWWA_Deliverable 2

hot!
Date added: 11/25/2014
Date modified: 11/25/2014
Filesize: 2.99 MB
Downloads: 1549

Governance

On inauguration of a Steering Committee, the Centre will be governed by a Steering Committee made up of the Directors of the Basel Convention Regional Centers in the African region, representatives of the Federal Government of Nigeria, one  member  state  representative  from  each  of  the  Basel  Convention  Regional Centres

Read more

Subscribe to Newsletter

Name:
Email:

The Pan-African Forum on e-Waste

The Pan-African Forum on E-waste was held in in UNEP Headquarters in Nairobi, Kenya, from 12 to 16 March 2012. The forum was a follow up to the recently concluded E-Waste Africa Project.

Read more about the forum